
MC Industrial is adding prefabricated modules utilizing a 2,500-ton crane to support the installation.
Dave Topping and Rob Haller shot aerial video production and still photography for a full day in Pekin Illinois. We utilized the Inspire Drone with 4K video camera resolution and 12 MP still images. And no, those clouds appearing as smoke from the stack were captured in real time and not added later. Sometimes a lucky photographer is the best to hire, LOL.
MC Industrial Performing Plant Upgrades for NRG’s Largest Power Plant in Illinois
MC Industrial, Inc. has been selected by NRG, a Fortune 250 utility leader, for environmental upgrades at the Powerton Generating Station in Pekin, IL, a 1536 MW plant with the capacity to power more than 1.2 million average homes. The plant upgrades are a part of NRG’s investment to modernize its Illinois coal fleet and dramatically reduce emissions.
Along with the AQCS retrofit, the second upgrade involves an Ash Handling and Precipitator Installation project. With the goal of meeting an aggressive outage window, MC Industrial is performing a prefabricated modules ground strategy utilizing a 2,500-ton crane to support the installation.
314-604-6544
stlouisdrones@gmail.com
Robert Haller, St Louis Video Producer